Image from Google Jackets
Image from OpenLibrary

Assessment of the contribution of poor frontend project managemet to delay and/or cost overrun in the construction industry in Tanzania : a case study of Tanesco Projects

By: Material type: TextTextPublication details: Dar es Salaam : University of Dar es Salaam, 2007.Description: xiii,94p. ; ill. ; 30cmSubject(s): LOC classification:
  • THS EAF HD9515.T34A52
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Collection Call number Status Date due Barcode
Theses & Dissertation Dr. Wilbert Chagula Library East Africana Collection THS EAF HD9515.T34A52 (Browse shelf(Opens below)) Not for loan 000000450513
Theses & Dissertation Dr. Wilbert Chagula Library East Africana Collection THS EAF HD9515.T34A52 (Browse shelf(Opens below)) Not for loan 000000450514
Theses & Dissertation Dr. Wilbert Chagula Library East Africana Collection THS EAF HD9515.T34A52 (Browse shelf(Opens below)) Not for loan 000000450515
Browsing Directorate of Library Services (UDSM) shelves, Collection: East Africana Collection Close shelf browser (Hides shelf browser)
No cover image available No cover image available No cover image available No cover image available No cover image available No cover image available No cover image available No cover image available No cover image available No cover image available No cover image available No cover image available No cover image available No cover image available
THS EAF HD9506.T34N784 The determinations of environmental disclosure practices in the extractive industry in Tanzania THS EAF HD9506.T34S24 The essence of corporate social responsibility in the tanzanian mining industry: a case study of bulyanhulu Gold Mining Limited (BGML) THS EAF HD9506.T34S24 The essence of corporate social responsibility in the tanzanian mining industry: a case study of bulyanhulu Gold Mining Limited (BGML) THS EAF HD9515.T34A52 Assessment of the contribution of poor frontend project managemet to delay and/or cost overrun in the construction industry in Tanzania : a case study of Tanesco Projects THS EAF HD9515.T34A52 Assessment of the contribution of poor frontend project managemet to delay and/or cost overrun in the construction industry in Tanzania : a case study of Tanesco Projects THS EAF HD9515.T34A52 Assessment of the contribution of poor frontend project managemet to delay and/or cost overrun in the construction industry in Tanzania : a case study of Tanesco Projects THS EAF HD9536.N9 Challenges and possibliites of marking markets work for the poor : the case of Barrick Gold Mines in Tanzania

Including bibliographical references

There are no comments on this title.

to post a comment.
Copyright © All rights reserved. University of Dar es Salaam, Directorate of Library Services
Powered by Koha. Installed, Configured, and Customized by the Library ICT Department