Image from Google Jackets
Image from OpenLibrary

Cost and time overrun on central government building construction projects in Tanzania (2000-2010)

By: Material type: TextTextPublication details: Dar es Salaam : University of Dar es Salaam , 2013Description: xii,95p. : ill. ; 30cmSubject(s):
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Collection Call number Status Date due Barcode
Theses & Dissertation Dr. Wilbert Chagula Library East Africana Collection THS EAF TH437.T34N456 (Browse shelf(Opens below)) Not for loan 000000323286
Theses & Dissertation Dr. Wilbert Chagula Library East Africana Collection THS EAF TH437.T34N456 (Browse shelf(Opens below)) Not for loan 000000323287
Browsing Directorate of Library Services (UDSM) shelves, Collection: East Africana Collection Close shelf browser (Hides shelf browser)
No cover image available No cover image available No cover image available No cover image available No cover image available No cover image available No cover image available No cover image available No cover image available No cover image available No cover image available No cover image available No cover image available No cover image available
THS EAF TH437.T34M73 Development of model for pricing of mechanical projects in Tanzania THS EAF TH437.T34M565 Development of parametric cost per square meter estimation model for residential building construction projects a case study of the consultant firms and contractors in Dar es salaam region THS EAF TH437.T34M565 Development of parametric cost per square meter estimation model for residential building construction projects a case study of the consultant firms and contractors in Dar es salaam region THS EAF TH437.T34N456 Cost and time overrun on central government building construction projects in Tanzania (2000-2010) THS EAF TH437.T34N456 Cost and time overrun on central government building construction projects in Tanzania (2000-2010) THS EAF TH438 .M42 Factors impeding performance of construction projects designed and supervised by consultants in local government authorities : a case study of Tanga region THS EAF TH438.13T34K334 Assessment of application and adoption of building information mideling in Tanzania: the case study of dar es salaam city

Includes bibliographical references
Thesis: MEM- University of Dar es Salaam

There are no comments on this title.

to post a comment.
Copyright © All rights reserved. University of Dar es Salaam, Directorate of Library Services
Powered by Koha. Installed, Configured, and Customized by the Library ICT Department