Image from Google Jackets
Image from OpenLibrary

The contribution of monitoring and evaluation to the performance of the Tasaf productive social safety net (PSSN) programme in Dar es salaam, Tanzania/ David Kitau

By: Material type: TextTextPublication details: Dar es salaam: University of Dar es salaam, 2023.Description: xiii,65p.; ill.; 30cmSubject(s): LOC classification:
  • THS EAF HD69.P75T34K583
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Collection Call number Copy number Status Barcode
Theses & Dissertation Dr. Wilbert Chagula Library East Africana Collection East Africana Collection THS EAF HD69.P75T34K583 (Browse shelf(Opens below)) 1 Not for loan 000000715288
Theses & Dissertation Dr. Wilbert Chagula Library East Africana Collection East Africana Collection THS EAF HD69.P75T34K583 (Browse shelf(Opens below)) 2 Not for loan 000000715289
Browsing Directorate of Library Services (UDSM) shelves, Shelving location: East Africana Collection, Collection: East Africana Collection Close shelf browser (Hides shelf browser)
No cover image available No cover image available No cover image available No cover image available No cover image available No cover image available No cover image available No cover image available No cover image available No cover image available No cover image available No cover image available No cover image available No cover image available
THS EAF HD69.P75T34H366 The role of end early marriage and teenage pregnancy project in reducing teenage pregnancy among adolescents in Mpanda Municipal, Tanzania/ THS EAF HD69.P75T34H366 The role of end early marriage and teenage pregnancy project in reducing teenage pregnancy among adolescents in Mpanda Municipal, Tanzania/ THS EAF HD69.P75T34K583 The contribution of monitoring and evaluation to the performance of the Tasaf productive social safety net (PSSN) programme in Dar es salaam, Tanzania/ THS EAF HD69.P75T34K583 The contribution of monitoring and evaluation to the performance of the Tasaf productive social safety net (PSSN) programme in Dar es salaam, Tanzania/ THS EAF HD69.P75T34L466 Assessment of the factor influencing adoption result based monitoring and evaluation system on the project performance: a case of Tanzania Telecommunication corporation limited THS EAF HD69.P75T34L466 Assessment of the factor influencing adoption result based monitoring and evaluation system on the project performance: a case of Tanzania Telecommunication corporation limited THS EAF HD69.P75T34N336 The of community participation in the perfomance of kizazi kipya HIV/AIDS projects in Iringa district, Tanzania

Includes: Bibliographical references,
Thesis: MA (Project Planning and Management)-University of Dar es salaam.

There are no comments on this title.

to post a comment.