University of Dar es Salaam
Online Public Access Catalog

Assessing the impact of work breakdown structure on cost estimation and time analysis in construction projects : a case study of Dar es Salaam city, Tanzania/ Manasseh Sado Shekalaghe

By: Material type: TextPublication details: Dar es Salaam: University of Dar es Salaam, 2024Description: xii, 83p.: ill.; 30cmSubject(s): LOC classification:
  • THS EAF T56.8.S545
No PDF attached
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Cover image Item type Current library Home library Collection Shelving location Call number Materials specified Vol info URL Copy number Status Notes Date due Barcode Item holds Item hold queue priority Course reserves
Theses & Dissertation Dr. Wilbert Chagula Library East Africana Collection East Africana Collection THS EAF T56.8.S545 (Browse shelf(Opens below)) 1 Not for loan 000000719539
Theses & Dissertation Dr. Wilbert Chagula Library East Africana Collection East Africana Collection THS EAF T56.8.S545 (Browse shelf(Opens below)) 2 Not for loan 000000719540
Total holds: 0

Includes: Bibliographical references.
Thesis: MSc (Construction management).

There are no comments on this title.

to post a comment.