000 | 00663nam a22001577a 4500 | ||
---|---|---|---|
040 | _cUDSM | ||
050 | _aTHS EAF TE175.T34E3 | ||
100 | 1 |
_aEdwad, Eradius _eAuthor |
|
245 | 1 |
_aEffect of inadequate design on cost and time overrun of road construction projects in Tanzania: _ba case study of Central Corridor road up grading projects |
|
260 |
_aDar es Salalam: _bUniversity of Dar es Salaam, _c2010 |
||
300 |
_axiii,93p.: _bill.; _c30cm. |
||
504 | _aIncludes bibliographical references Thesis: M.Sc (High way Engineering) -Univerity of Dar es Salaam | ||
650 | 1 | _aRoad construction projects | |
650 | 1 | _aHighway design, Tanzania | |
942 |
_2lcc _cDST _n0 |
||
999 |
_c141122 _d141122 |